Quality Control
Four Gates. No Batch Skips One.
01 · Incoming material check
Every rubber compound lot is verified against its spec — hardness, tensile and elongation — before it enters production.
02 · In-process inspection
First-article approval on every mold run, then scheduled dimensional checks through the shift.
03 · Lab testing
Our QC lab runs hardness, compression set, aging and fluid-resistance tests to ASTM D2000 callouts.
04 · Final AQL inspection
Pre-shipment sampling inspection, de-flashing verified, parts counted, packed and labeled to your spec.
Four gates. No batch skips one: incoming material check, in-process inspection, lab testing to ASTM D2000, and final AQL inspection before shipment.
Certifications
ISO 9001:2015 & IATF 16949:2016
- ISO 9001:2015 — Certified quality management, audited annually.
- IATF 16949:2016 — Automotive-grade process control for OE supply chains.
- ASTM D2000 — Compounds tested to the international rubber material standard.
- 24-hour response — RFQs answered within one business day.
Current certificates are available on request with every quotation.

Quality You Can Audit
Visit our factory, or request current certificates and test reports with your quotation.